Laserfiche WebLink
.. ~ • <br />i <br />c~~~~~ <br />~ ~~ <br />~ EXHIBIT D: MINING PLAN <br />Moderate Disturbance: <br />The access road to the pit was, for the most part, in <br />existance prior to the operations performed in 1979 <br />under Special 10-Day Permit ~k 79-75. It was improved <br />during those operations and extended to the Stockpile- <br />Operations Area specified in that permit. The Stockpile- <br />Operations Area was cleared and graded under the 10-Day <br />Permit and need only be extended to the north as <br />stockpile requirements or expansion of operations demands. <br />The 50' ribbon of land north of the Stage 1 mining area <br />will be left to serve as a buffer between the pit and the <br />fenced farmland immediately to the north. As mining <br />progresses to the edge of the ribbon a road width strip <br />will undoubtedly be graded for use as access to either <br />the pit or, in the case of the property owner, to the <br />farmland. Other than this moderate disturbance we <br />anticipate that this area will remain relatively unchanged. <br /> <br />_.. --- ..-~..~ _ . _.__..._~.W...1~.~~.._ . _ _ ___ .. _ . _~ <br />-- ~ ~~.~ <br />