Laserfiche WebLink
Sannyside Gold Corp. Febniary 26, 2003 <br />Termination Asscssmcm page 2 <br />d. Hydrologic controls and seals eliminating Flows from the lower American <br />Tunnel portal have been completed, or CDPS Permit No CO-0027529, for water <br />treatment at the American Tunnel, will have been accepted by another party or <br />parties. <br />e. All projects on the "A" List are confirmed by the Division to be completed <br />pursuant to paragraph 8a. <br />f Treatment of Cement Creek has ceased <br />g. It is demonstrated in accordance with Appendix A that the Reference <br />Water Quality is being maintained without continued treatment of Cement Creek <br />The following table presents the status of each criterion: <br />Consent Decrec Permit Termination Assessment <br />Criteria for Termination Status <br />a. Five years from the date of valve closure at The valve was closed at the American Tunnel <br />the American Tunnet property line plug property line plug in September 1996. Six ~/ <br /> ears and three months <br />b. Two years since notice of mine pool Mine pool reached equilibrium in November <br />equilibrium has been given pursuant to 2000. Two years and one month. ~! <br />Para a h 9a <br />c. Valves and pipes in the seals in the Valves and pipes in the seals at the property <br />American and Terry Tunnels have been line in the American Tunnel were grouted in ,~ <br />grouted June 2001. Valves and pipes in the seals in the <br /> Terry Tunnel inside plug were grouted in <br /> August 2000. The near-surface Terry Tunnel <br /> plug was constructed in September 2000 and <br /> valves and pipes were grouted in October 2000. <br /> Valves and pipes in the second plug in the <br /> American Tunnel were grouted in Au ust 2002. <br />d. 1) Hydrologic controls and seals eliminating 1) The near surface plug was installed in the <br />flows from the lower American Tunnel portal American Tunnel in November 2002. Valves ,~ <br />have been completed, or and pipes in the seals were grouted in <br />2) CDPS Permit No CO-0027529, for water December 2002. <br />treatment at the American Tunnel, will have 2) Permit No CO-0027529 was transferred to f <br />been accepted by another party or parties. Gold King Mines Corporation on January 14, <br /> 2003. <br />e. All projects on the "A" List are confirmed <br />by the Division to be complete: <br />- American Tunnel Mine Waste September, 2001 f <br />- Boulder Creek Tailings Project September, 2001 f <br />- Ransom Portal April, 1998 f <br />- Surface Mill Tailings at Eureka April, 1998 ~ <br />- Gold Prince Mill Tailings September, 2001 f <br />- Longfellow Koehler Mine Waste September, 2001 f <br />R-4 <br />