Laserfiche WebLink
• • <br />~~ <br />Cotter Corporation <br />Mr. David C. Shelton <br />P1ined Land Reclamation Division <br />October 26, 1984 <br />Page Two <br />2. Vegetation: <br />a) Bouteloua Curtipendula (Vaugh) (Sideoats Grama) wets applied <br />at a rate of 30 lbs./acre. <br />b) Bouteloua Gracilis (Blue Grama) was applied at a rate of <br />30 lbs./acre. <br />c) Stipa Virdula (Green Needle Grass) was applied at a rate <br />of 25 lbs./acre. <br />d) Dactylis Glomerata (Potamac) (Potamac Orchard Gra~;s) was <br />applied at a rate of 30 lbs./acre. <br />e) Thaleum Pratense (Climax) (Climax Timothy) was apF~lied at <br />a rate of 20 lbs./acre. <br />As is evidenced by the vegetation growth throughout tfie summer <br />of 1984, the planting was a success. <br />B. A flood protection wall and fire pump station have been constructed <br />in the area of affected land. The flood protection wall F~rotects the <br />ore sorter stockpile area and the fire pump station is located ad- <br />jacent to the water treatment plant detention ponds. These addi- <br />tions are included on the map accompanying this report, whiich also <br />reflects the current configuration of the stage one west waste pile <br />development. <br />Finally, mining operations for the 1985 report year will remain as presented <br />in the 1983 permit application. <br />If there are any questions regarding this information, please contact me. <br />Sinc~erely-, <br />~` ~oLXI'CJ,) P~l.~ <br />A. 0. Courtney <br />Director of Environmental Affairs <br />ALJ/jj <br />