My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43629
DRMS
>
Back File Migration
>
Report
>
REP43629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:53 AM
Creation date
11/27/2007 9:57:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Report
Doc Date
8/18/1983
Doc Name
REFUSE PILE CERTIFICATION FOR SNOWMASS COAL CO
From
SNOWMASS COAL CO
To
MLR
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> REFUSE DISPOSAL SITE CHECK SHEET <br /> ITEM COMMENTS <br />1. Coal refuse de osited in 24" lavers x <br /> Continued compaction values may <br />2. Each layer is compacted to at least require more proctors to varify <br /> 907. maximum dr densit x h lue bein d. <br />3. v-Ditch D-9 installed To be realligned once new road is <br />_ _a. Slope :[ Variable _ installed <br /> b. Ditch linin *faterial x _ <br />4. V-Ditch D-10 installed. <br /> a. Slope X Variable <br /> b. Ditch lining Afaterial <br /> X <br />5. Height of refuse material since last <br /> bench (If 40' CONSTRUCT BENCH?) $-9' ft. X <br />6. Bench bean constructed. x <br />7. Refuse material outslope is 24° or <br /> 1V: 2~ H Maximun X <br />8. Bench width is 20 feet x <br /> Last bench needs s ope lnwar <br />9. Bench slope is back towards refuse pile a[ when Covering the outslope of the <br /> 1V: 20 H Minimum. x next bench <br />10. Benches are pitched towards either side to <br /> divert runoff to ditch D-9 or D-10. x <br />11. Completed outslopes and benches are covered <br /> 'with at least 4' of nontoxic, noncombustible <br /> material includin an ade uate to soil laver, x <br />]2. Evidence of anv structural defects.* x * If yes see comments below <br />13. Topsoil from previously undisturbed areas <br /> bean salva ed ade uately. x <br /> Some wood in material being <br />14. Trash and other debris being separted dumped - needs cleaned prior t0 <br /> from coal refuse. COmpaCt'IOn <br /> x <br />15. Additional comments or observations <br /> ~, <br /> No refuse compaction past Feb. 20 because of shutdown - only minor amounts being deposited <br /> .. <br />I hereby certify that the inspection of the refuse disposal area vas done under my <br />iirect supervision and is constructed as per the current Colorado Mined Land Reclamation <br />Permit requirements.lst Quarter 1983. <br /> <br />)ate <br />- - 8 ~ „ ~/,f <br />/C'`~ <br /> Qf¢j' Signature <br /> '4"o Larry M. Reschke <br /> i P.E. #19691 <br /> 1~1 ~~ <br /> <br /> ~~' <br />
The URL can be used to link to this page
Your browser does not support the video tag.