My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43222
DRMS
>
Back File Migration
>
Report
>
REP43222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:19 AM
Creation date
11/27/2007 9:50:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
4/22/1993
Doc Name
TEX 1992 ANNUAL RECLAMATION REPORT 01/01/92 TO 12/31/92
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Summery. The soil replacement thickness for the remaining permit terms was projected to be <br />1.0 feet (Permit C-80-005, Tab 9, Attachment 9-4). The balance completed above shows at <br />least 0.8 feet of soil will be available to be replaced. Peabody suspects the difference <br />between pre-disturbance projected end post-disturbance actual soil redistribution thickness <br />is attributed to two important factors. First the density of soil in stockpiles has <br />probably increased end caused an underestimation of soil that is stockpiled. The <br />stockpiled soil will swell during redistribution. Second, the soil volume figure of 129.8 <br />acre-feet provided for stockpile site XN in November 1987 was apparently incorrect. About <br />11.5 acre-feet of soil was removed from this pile during 1992. However, the 1992 survey <br />information indicates this pile decreased in volume by 51.9 acre-feet (Table 92.3). <br />Peabody will continue to seLvege, store, end replace soil as described and approved in <br />Permit C-80-005. Peabody's soil scientist and reclamation supervisor will continue to <br />closely monitor soil handling activities at Seneca II, verifying scraper operators ere <br />salvaging all viable soil materials and redistributing soil at the specified thickness. <br />Revegetetion <br />Revegetetion activities in 1992 included permanent revegetation of disturbance areas at the <br />• Seneca II Mine. Permanent revegetation included seeding and planting of trees and shrubs. <br />Permanent seeding was completed on 28.0 acres in the wedge mining area and 42.5 acres in <br />the wolf Creek mining area, as shown on Exhibit 92.5, Seeding, Planting, and Noxious weed <br />Survey/Control Locations. Also shown on Exhibit 92.5 is a 1.7 acre area in the wedge which <br />was seeded in 1990, but was not reported in the 1990 Annual Reclamation Report. Seedbed <br />preparation operations, where used, consisted of tillage with an off-set disc prior to <br />permanent seeding. Seed Mix #1 with supplemental species as presented in Table 92.4, was <br />submitted to the Division for review in September 1492. Seed M(z #1 was used for ell <br />permanent seeding conducted et the Seneca II Mine in 1992. Seeding was completed with a <br />modified rangeland type drill seeder equipped with multiple seed boxes end depth bands on <br />the disc openers. <br />No mulching activities were conducted during 1992. All permanently revegeteted areas were <br />cover cropped with winter wheat at an approximate drilled rate of 15 pounds per acre. <br />A total of 9,782 seedlings were planted in 6 concentrated shrub planting areas in 1992 (See <br />Exhibit 92.5 for locations). Table 92.5 lists planting areas and approximate acreages, <br />• species composition of each area, and the total numbers planted by species for each area. <br />All plant materials were one-yea r-old stock developed from chokecherry, serviceberry enc <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.