My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP43065
DRMS
>
Back File Migration
>
Report
>
REP43065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:45:07 AM
Creation date
11/27/2007 9:47:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
6/15/1999
Doc Name
1998 ANNUAL HYDROLOGY REPORT PN C-81-071
Annual Report Year
1998
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TABLE 1 (Continued) <br />HYDROLOGIC MONITORING SITES <br />SPOIL WELLS AND SPOIL SPRINGS <br />SITE MONITORING FREQUENCY COMMENTS <br /> Water Level or Water Quality <br /> Flow Sc Field S:+mpling <br /> Parameters <br />Saoil Wells <br />001-SP-6 Quarterly - WaterLcvclOnly <br />001-SP-7 Quarterly - Water L.cvcl Only <br />026-SP-1 Quarterly Semiannually <br />02(-SP-2 Quarterly Semiannually <br />02G-SP-3 Quarterly Semiannually <br />Snoil Snrines <br />A2 Quarterly - (1) & (2) <br />B3 Quarterly - (1) & (2) <br />Cl Quarterly - (1) & (2) <br />C2 Quarterly - (1) & (2) <br />D Comp Quarterly Semianuually (1) & (2) <br />• E <br />X Quarterly <br />Quarterly Semiannually <br />Semiannually (2) <br />(2) <br />114 Quarterly Semiannually (2) <br />NOTES: <br />(1) Composite santplc from A, B, C, and D series springs. <br />(2) During spring runoff, springs which arc part ol'thc monitoring program will he monitored monthly for <br />Clow and field parameters. Monthly monitoring +rill cease once peak runoff has passed. At time of <br />annual survey, Oow and field parameters are measured at all identified springs. If flow is greater than <br />35 gpm, a full suite sample is collected and site is added [o the spoil spring plan. If less than 35 gpm, <br />no further monitoring. <br />• <br />I Uv!.U[NVIRONMENT.V.~V IR47J%4'Yi'~' \I <br />
The URL can be used to link to this page
Your browser does not support the video tag.