Laserfiche WebLink
• <br />TABLE 1 (Continued) <br /> HYDROLOGIC MONITORING SITES <br /> WATER LEVEL MEASUREMENTS <br />SITE MONITORING FREQUENCY COMMENTS <br /> W ater bevel Only <br />Foidel Creek <br />14 Monthly (1), (2) & (3) <br />8 Monthly (1), (2) & (3) <br />304 Monthly (1), (2) & (3) <br />Foidel Creek Alluvium <br />16 Monthly (1), (2) & (3) <br />302 Monthly (During Irrigation) (1) & (4) <br />307 Monthly (1), (2) & (3) <br />1002 Monthly (I), (2) & (3) <br />NOTES: <br />(1) Included with Twentymile Coal Company's hydrologic monitoring program. 11'+itc i+ removed from <br />TCC's program anJ continued monitoring is required, CYCC will monitor site. <br />• (2) Monthly measurements for water level collected during ice free months: late March or early April <br />through September. <br />(3) These sites arc also components of surface stream ilow moaitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to begin once Fish Creek <br />Dewatering Facility is functioning. <br /> <br />I.~E17\EN VIRONM6MALWiR\I998\CYCC \LS <br />