D
<br />y
<br />:p
<br />>o
<br />•
<br />KEENESBURG ASHDATA
<br />Standby Ash
<br />Date Driver 894 895 Trailer Time Loads Tons Comments SB Pit NB Pit WA Pit Total Tons
<br />2/1198 J. Snider 328 0 112 0.0 3 72.75 25% tt; wsh 894 6 112 108,675 5,667 239,475.75 353,817.75
<br />2/1/98 D. Snider 0 327 114 0.0 3 72.75 Cvr ash 311; wtr 600; 25% h 108,675 5,667 239,548.50 353,890.50
<br />2/2/98 D. Snider 0 327 114 0.0 3 72.75 108,675 5,667 239,621.25 353,963.25
<br />2/2/98 J. Snider 328 0 112 0.0 3 72.75 Level ash 233; 25°h tt 108,675 5,667 239,694.00 354,036.00
<br />2/3/98 J. Snider 328 0 112 0.0 3 72.75 Cvr ash 311; wtr 600 708,675 5,667 239,766.75 354,108.75
<br />2/3/98 D. Snider 0 327 114 0.0 3 72.75 25%It 108,675 5,667 239,839.50 354,161.50
<br />2/4198 Jesser 329 0 112 0.0 3 72.75 108,675 5,667 239,912.25 354,254.25
<br />2/4/98 D. Snider 0 327 114 0.0 3 72.75 25%It 108,675 5,667 239,965.00 354,327.00
<br />2/5/98 Cordes 0 327 114 0.0 3 72.75 Cvr ash 311;vrtr600 108,675 5,667 240,057.75 354,399.75
<br />2/5/98 D. Snider 328 0 112 0.0 3 72.75 25% tt 108,675 5,667 240,130.50 354,472.50
<br />2/6/98 J. Snider 328 0 112 0.0 3 72.75 25% It; grs 894 8 112 108,675 5,667 240,203.25 354,545.25
<br />2/6/98 Cordes 0 327 114 0.0 3 72.75 25% tt 108,675 5,667 240,276.00 354,616.00
<br />2/7/96 Jesser 328 0 112 0.0 3 72.75 108,675 5,667 240,348.75 354,690.75
<br />2/7/98 Cordes 0 328 114 0.0 3 72.75 Cvr ash 311; wtr 600; silo empty 108,675 5,667 240,421.50 354,763.50
<br />2/8/98 Kipp 109 0 112 0.0 1 24.25 Cvr ash 311 108,675 5,667 240,445.75 354,787.75
<br />i 2/8198 Cordes 0 216 114 0.0 2 48.50 25°,51t; #5 boiler do last night 108,675 5,667 240,494.25 354,836.25
<br />2/9/98 Jesser 329 0 112 0.7 3 72.75 Detours due to crane 8 hop truck 108,675 5,667 240,567.00 354
<br />909.00
<br /> ,
<br />2/9/96 D. Snider 0 327 114 1.0 3 72.75 Cvr ash 311; vrtr 600; W/O acid truck 108,675 5,667 240,639.75 354,961.75
<br />2/10/98 D. Snider 328 0 112 0.0 3 72.75 108,675 5,667 240,712.50 355,054.50
<br />2/10/98 Cordes 0 328 114 0.0 3 72.75 108,675 5,667 240,785.25 355,127.25
<br />2/11/98 Cordes 0 326 114 0.0 3 72.75 Cvr ash 311; vvtr 600 108,675 5,667 240,658.00 355,200.00
<br />2/11/98 Kipp 328 0 112 0.0 3 72.75 108,675 5,667 240,930.75 355,272.75
<br />2/12/98 Cordes 0 334 114 0.0 3 72.75 108,675 5,667 241,003.50 355,345.50
<br />2/12/98 J. Snider 437 0 112 0.0 4 97.00 50°h tt 108,675 5,667 241,100.50 355,442.50
<br />2/13/98 J. Snider 438 0 112 0.0 4 97.00 Cvr ash 311; vrtr 600 108,675 5,667 241,197.50 355,539.50
<br />2/13198 Cordes 0 437 114 0.0 4 97.00 108,675 5,667 241,294.50 355,636.50
<br />2/14/98 D. Snider 0 436 114 0.0 4 97.00 108,675 5,667 241,391.50 355,733.50
<br />2/14/98 J. Snider 438 0 112 0.0 4 97.00 25°h tt 108,675 5,667 241,486.50 355,830.50
<br />2/15/98 D. Snider 0 327 114 0.0 3 72.75 Cvr ash 311; wtr 600 108,675 5,667 241,561.25 355,903.25
<br />2/15/98 J. Snider 328 0 t 12 0.0 3 72.75 Empty silo 108,675 5,667 241,634.00 355,976.00
<br />2/16/98 D. Snider 0 328 114 0.0 3 72.75 108,675 5,667 241,706.75 356,048.75
<br />2/16/98 J. Snider 339 0 112 0.0 3 72.75 25%It 108,675 5,667 241,779.50 356,121.50
<br />2/17/98 D. Snider 0 436 114 0.0 4 97.00 Cvr ash 311; wtr 600 108,675 5,667 241,876.50 356,218.50
<br />2/17/98 J. Snider 438 0 112 0.0 4 97.00 25%It 108,675 5,667 241,973.50 356,315.50
<br />2/18/98 Jesser 326 0 112 0.0 3 72.75 108,675 5,667 242,046.25 356,388.25
<br />2/18/98 D. Snider 0 327 114 0.0 3 72.75 25% It 108,675 5,667 242,719.00 356,461.00
<br />2/19/98 Cordes 0 328 114 0.0 3 72.75 108,675 5,667 242,191.75 356,533.75
<br />2119/98 D. Snider 439 0 112 0.0 4 97.00 Cvr ash 311; vrtr 600 108,675 5,667 242,288.75 356,630.75
<br />
|