My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP42895
DRMS
>
Back File Migration
>
Report
>
REP42895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:44:53 AM
Creation date
11/27/2007 9:44:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
1/31/1999
Doc Name
1998 PROJECT STATUS AND ANNAUL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The A and B-Groove aquifers had insignificant WL change from 1994 to 1998, but <br />continued to reflect minor or no effects of water well pumpage. The Perched aquifer, with <br />the historically highest potentiometric water level, indicated recompletion effects (+11') <br />immediately following recompletion with WL data slowly increasing over the period of <br />record. The Dissolution Surface indicated a trend toward lower potentiometric levels in <br />1991 and 1992 following recompletion, but similar to other Dissolution Surface wells (down- <br />dip and up-dip) in late 1993 an increase of 14' was noted. From 1994 -1998 the water level <br />has been fairly stable. <br />• Dedicated Monitoring Wells Up-Gradient. South Of Lease <br />Wells established to monitor up-gradient conditions following 1997 completion of <br />production wells are: <br />Wells A uifer <br />BG-1 B-Groove <br />DS-2 Dissolution Surface <br />The up-gradient wells, south of the lease on the production well 3A-4H pad, were <br />completed in September 1997. Following addition of cement (outside of the casing) and <br />extensive blowing out water from the wells, water levels and WO data has been collected. <br />WQ of BG-1 changed from 4000 to 1500 umhos/cm for conductivity as a result of the <br />recompletion work. WO is typical of other B-Groove wells. However, DS-2 changed very <br /> <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.