Laserfiche WebLink
<br />Comprehensive Monitoring Plan was revised with regard to the hydrology section. The <br />BLM, EPA, and Division of Minerals and Geology (DMG) approved modification of <br />hydrology sampling. No new wells or bonding changes were required in 1998. <br />An Air Pollution Emission Notice (APEN) was filed with the Colorado Department of Health <br />(CDH) and Air Pollution Control Division (APCD) for a new air classifier and baghouse. <br />Thirteen undesirable event reports were filed in 1998. Reports for overflow from the <br />process pond into the waste pond (6), pipeline leaks (3), and well head leaks (4) were <br />submitted to the appropriate regulatory agencies. No notices of noncompliance were <br />issued in 1998. Site inspections by the BLM, EPA and DMG were performed with <br />compliance noted. <br />3.1.2 Project Activities <br />The two new production wells were put in service to begin mining cavity #1A in March. <br />Mining continued successfully throughout the year from cavities #1 A, 3A, and 4. <br /> <br />5 <br />