Laserfiche WebLink
<br />(Page 2 ) <br />- i• <br />Stage II <br />•• <br />' VALCO, INC. <br />PUEBLO CONCRETE DIVISION <br />P. O. BOX 857 <br />PUEBLO, COLORADO 81002 <br />(719561-8350 <br />backfilling will continue <br />Stage III - part 1 <br />This area will continue to be filled in during the coming <br />year with material from the crusher plant. <br />Stage III - part 2 <br />Backfilling and grading has started on the north and south <br />sides of this area = 1.15 acres <br />4. Grass was planted on the south side of Stage II on September 14 thru <br />16. It consisted of a mixture of Western Wheatgrass (53.86%), <br />Crested Wheatgrass (29.44%) and Yellow Scaeet Clover (10.42%). <br />70 trees were planted on the south side of. Stage II. <br />30 trees were planted on the north side of Stage I. <br />They consisted of Russian Olive, Catalpa, Cottonwood and Maple. <br />5. Approximately 100 lbs. of 18-46-0 Fertilizer was used for the <br />grass that was planted on the south side of Stage II. <br />6. In 1987 - 1988 (3/22/87 thru 3/22/88) Valco Inc. was very successful <br />in their Reclamation efforts. <br />7. Estimate of Affected Acres for the coming year, 1988 - 1989 (3/22/88 <br />thru 3/22/89)Stage IV - part 2 = 15.13 acres <br />Sincerely You s, <br />Mark Klune <br />feneral Manager, Valco Inc. <br />Pueblo Concrete Division <br />LAMAR ROCKY FORD CANON CITY GUNNISON CRESTED BUTTE <br />