Laserfiche WebLink
<br />March 21, 1988 <br /> <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />:~ - r• <br />' va~co, INC. <br />PUEBLO CONCRETE DIVISION <br />P. O. BOX 857 <br />PUEBLO,COLORADO 81002 <br />(779)567-8350 <br />mailed Certified P 254 080 662 <br />Re: Annual Report <br />Valco Inc. - Pueblo Concrete Division <br />MLRB Permit - -0k77-573 <br />Pueblo, Colorado - 41est Pit <br />1. 1987 - 1988 Affected Acres ( 3/22/87 thru 3/22/88) <br />Stage III - part 2 = 5.81 acres <br />Stage IV - part 1 = 3.44 acres <br />Railroad Right of Flay (EAST) = 2.1 Acres <br />Stage IV - part 2 = 3.6 acres <br />Area 5 - Stage X (Conveyor Pad} = 1.55 acres <br />Stages IV, V, VI, and VII (Dewatering Ditch) _ .55 acres <br />2. 1987 - 1988 Acres Reclaimed (3/22/87 thru 3/22/88) <br />Stage II <br />South Side - backfilled, graded, topsoil replaced, <br />grass planted and fertilized, approximately <br />70 trees planted = 3.44 acres <br />North Side - backfilled, = 1.66 acres <br />Stage III <br />South Side - backfilled, graded = .92 acres <br />North Side - backfilled, = 1.84 acres <br />East Side - backfilled, graded = .57 acres <br />Stage III will continue to be filled in during the coming <br />year with material from the crusher plant <br />3. Stages of Reclamation <br />Stage I <br />Backfill, grading and topsoil replacement have been <br />completed on the entire area. Approximately 35 trees <br />have been planted on the north side. <br />Grass planting coill start in April of 1988. <br />LAMAR ROCKY FORD CANON CITY GUN NISON CRESTED BUTTE <br />