Laserfiche WebLink
Area I <br />Area II <br />Area I (Starting from the utility pole going south for 120 ft. <br />and from the fence to the pond perimeter). <br />This area was slurry seeded (17.8 lbs./acre) then Biosol <br />was applied Ss slurry (I ton/acre) followed by hydro mulching <br />with wood fiber mulch at 2506 IbS./sore. <br />Area II (Starting 12ft ft. from the utility pole goln~ south for <br />1~. and from the fence to the pond perimeter). This area <br />was lurry seeded (17.5 ibs.lacre) straw-mulched (2000 <br />lbs./acre) and then tacifler slurried at 150 lbs./acts. <br />Areas III & IV (Starting 240 ft. from the utility pole going <br />south for 240 ft. and from the fence to the pond perimetery <br />These azeas were drill seeded (17.8 lbs./acre) straw-mulched <br />(200016s./aca`el and rrimpe/~. <br />Area V (Starting 480 ft.. from the utility pole going south fpr <br />120 ft. and from the straight extension of the' fence line to the <br />pond perimeter. This are&s was drill sedddd then l~iosol (1 <br />ton/acreJ was applied ~s shirty followed by hydro mulching <br />with wood fiber mulch at 2500 lbs./acre. <br />,Area III <br />Area IY <br />Area VI <br />Area V <br />Atea VI was drill seeded (17.8 lbs.lacre) straw--rn~lched (2006 <br />lbs./acre) and crimped. <br />