INTRODUCTION <br />This report describes all disturbance and reclamation activities which have <br />occurred at the Kerr Mine emphasizing those activities which occurred during the <br />period of October 1, 1990 through September 30, 1991. As in previous years, the <br />market for coal has remained soft, resulting in relatively low production rates. Coal <br />production at the Kerr Mine for the year was approximately 62,400 tons or seven <br />percent of permitted capacity. Total overburden removed and backfilled in the <br />` south end of Pit 1 was approximately 364,500 BCY. Approximately 440,100 CCY <br />were removed from the existing overburden stockpile and placed in the 720 Pit <br />backfill. No new areas were backfilled to their approximate original contour, <br />graded, retopsoiled, or revegetated during the year. <br />All mining activities during the year were confined to the previously disturbed Pit <br />No. 1 area. No new disturbance was created during the year. <br />LOCATION AND SIZE OF AFFECTED AREAS <br />1. Mining and Topsoil Removal <br />No new areas were disturbed and no topsoil was removed during 1991. <br />The total active mine area at Pit No. 1 is 28.29 acres. Mining is <br />completed in the 720 Pit area and no new disturbance associated with <br />the 720 Pit has occurred. A total of 43.73 acres remains open for future <br />backfilling. The areas described above are shown on the 1991 <br />Reclamation Map, (Map 1). <br />1 <br />