Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 C O L D RA D O <br />Denver, Colorado 80203 o t v t s t o N o r <br />Phone: (303) 866-3567 MINERAL S <br />FAX: (303) 832.8106 G E O L O G Y <br /> 0.E ClANATlO N•NINING <br /> SAfETY•SCIfNCE <br />Interoffice MEMORANDUM Bill Owens <br />Governor <br />Russell George <br />to: C-1982-056, Coal Refuse /Pile Inspection Report Enecutive Director <br />from: Byron G. Walker 2~-~ Ronald W. Gttany <br />subject: Review ofthe 2"d Quarter 2006 Refuse Pile Inspection Report, Foidel CreelPTtlffi~9~,'r~r <br />1982-056 Natura Resource Trustee <br />date: July 27, 2006 <br />Table of Contents <br />Table of Contents.... <br />Rule 4.09.1(11)(a)... <br />Rule 4.09.1(1 I)(c) ............................................................................ ..............................................2 <br />Rule 4.10.1(1) .................................................................................. ..............................................2 <br />Rule 4.10.1(1)(b) .............................................................................. ..............................................2 <br />Rule 4.10.2(1) .................................................................................. ..............................................2 <br />Rule 4.10.2(2)(a) .............................................................................. ..............................................2 <br />Rule 4.10.2(2)(b) .............................................................................. ..............................................2 <br />Rule 4.10.2(2)(c) .............................................................................. ..............................................3 <br />Rule 4.10.2(2)(d) .............................................................................. ..............................................3 <br />Rule 4.10.2(3) .................................................................................. ..............................................3 <br />CDMG Policy Memorandum, 7/13/84 ............................................. ..............................................3 <br />Rule 4.09.1(1 1)(a) The fill shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockftll embankments <br />under the direction of a qualified professional engineer at least quarterly throughout the <br />construction and during the following critical construction periods: (1)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation ofsurface drainage <br />systems, (4) placement and compaction offill materials, and (5) revegetation. <br />The subject inspection was a quarterly inspection accomplished throughout construction, not one <br />of the critical construction periods. A registered engineer signed the report. <br />Rule 4.09.1(11)(b) The qualified registered engineer shall provide to the Division a certified <br />report within 2 weeks after each inspection that the fill has been constructed as specified in the <br />design approved by the Division. The report shall include a description of any appearances of <br />instability, structural weakness, and other hazardous conditions observed during the inspection. <br />A copy of the report shall be retained at the mine site. <br />Office of - ice of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />