Laserfiche WebLink
<br />_; <br />contour. As mentioned earlier, the sediment removed periodically from <br />the retention pond should be stockpiled and used for cover material as <br />a part of the reclamation plan. It is our opinion that the majority of <br />this sediment will be eroded top soil and should therefore provide a <br />good basis for re-vegetation. <br />}' <br />F. M. FOX S ASSOCIATES, INC. <br />Bruce A. Florquist, P.E. <br />Vice President <br />BAF/gw <br />Cupies: 3 ~ P, <br />~. <br />~`~14412W* <br />,. r. <br />~. <br />~~~q~,ss~onni_~:+ 4Q~o <br /> <br />8 <br />