Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description I Cosi (S) <br />-____--- I --------------------------------_----__--__---- I _-----.--- <br />I NA - No such work required I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />_________-__ <br />L. DRILL HOLE/MONITORING VEIL SEALING <br />Task No.l Tesk Description I Cost (S) <br />I NA - No Such work required <br />Subtotal (L): <br />eeveeeeeevee <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.f Task Description I Cost (5) <br />I I <br />8 I Demolition Per attached worksheet I 51,168 <br />9a b 9b I Seeding Per attached worksheets I 55,231 <br />10 ~ Fencing 3,619 LF a S 7,17/LF I 54,234 <br />11 I Mob/Demob I f4,327 <br />Subtotal (M): 514,961 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through. M): 581,730 <br />eeeee.e.ceee <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description I Cost (f) <br />1. I Public Liability Insurance,... 1.SSOX of dir. I 51,267 <br />2. I Contractor's Performance Bond 0.975% of dir. I 5797 <br />3. I Contractor's Profit.......,... 10,OOX of dir. I 58,173 <br />4. I Job Superintendent..Per attached worksheet I 53,859 <br /> Subtotal (A): 514,096 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 595,826 <br /> <br />B. DNG PROJECT ADMINISTRATION EXDENSES _ ______-____ <br />Item No.l Item Description <br />------- I-------------------------------- I <br />-------------- I - Cost (5) <br />----------- <br />I <br />1. I Minerals Program Admin. Fee at I <br />S,OOX of cntr.l <br />54,791 <br />NE7 INDIRECT COST PERCENTAGE: 23,7tX Subtotal (B): 54,797 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 518,887 <br />_=====zees== <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs: 5100,618 <br />~~2s! <br />