Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 at 4 <br />H. EART HNORK STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (5) <br />______~_I_______~_________________~______________________I____________ <br />~ NA - no such rork required <br />Subtotal (H): <br />____________ <br />I. EARTHNORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (5) <br />______.._I_______.._________~________________________________I___r_______ <br />5 ~ Install irrigation ditches across reclaimed ereas~ 57,362 <br />Subtotal (I ): f1,362 <br />J. EARTH4ORK TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description ~ Cost (f) <br />________ ________________________________________________ <br />6 ~ Replace stockpiled topsoil over regraded pit area 512,457 <br />7 ~ Replace stockpiled topsoil over facilities area ~ E9,3OO <br />Subt oral (J): 521,751 <br />00256 <br />