Laserfiche WebLink
<br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />WEST RIDGE WASTE PILE <br />Item Y/N Comments <br />11. Evidence of structural defects? N <br />12. Topsoil adequately salvaged and stored? Y No additional topsoil was salvaged from the pile this <br />quarter. Topsoil and subsoil was replaced as required <br />to maintain berm around perimeter of pile. <br />13. Trash removed? Y <br />14. Additional comments? N <br />During the 1st quarter, 1994, construction of the West Ridge Waste Pile continued with gob generated from reject <br />material at the East Mine Crushing & Screening facility and from material cleaned from the old "parking lot" <br />area above the crushing and screening facility. Compaction deficiencies stemming from excessive moisture in <br />the OVWM sediment pond gob moved to the pile in the fourth quaver of 1993 were corrected. Drainage control <br />was monitored and maintained throughout [he quarter. <br />I certify the above report as being accurate to the best of my belief and knowledge. <br />Signature <br />~~io/y~ <br />Date <br />