My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP41478
DRMS
>
Back File Migration
>
Report
>
REP41478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:43:19 AM
Creation date
11/27/2007 9:02:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
6/6/1994
Doc Name
PN C-81-038 1ST QTR 1994 REPORTS
From
CYPRUS ORCHARD VALLEY
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />WEST RIDGE WASTE PILE <br />Item Y/N Comments <br />1. Quantity of waste material added to Y Approbtnately 1716 tons of gob were added to the <br />waste disposal area this quarter? waste disposal pile this quarter. <br />2. Waste material deposited and compacted N Waste material was deposited and compacted during <br />in 24" lifts? the quarter in 24" lifts. Wet material from the <br /> clean out of [he OV WM sediment which originally failed <br /> to meet compaction requirements was dug out and <br /> recompacted successfully. <br />3. Drainage alterations constructed? N No drainage alterations were constructed during the <br /> the quarter. The etdsting drainage pattern was <br /> maintained around the perimeter o[ the pile to protect <br /> outslopes and duect drainage to ditches at the toe of <br /> the pile. <br />4. Present height of waste material? Highest height approtutnately 94.0 feet. <br />5. New bench constructed? N <br />6. Refuse material outslope placed at Y Slopes were checked for proper placement periodically <br />1V:2H outslope? during construction. <br />7. Adequate drainage on top of completed Y Grading was maintained on top of completed fdl lifts to <br />Fill? ensure proper drainage from the top of the pile. <br />8. Bench drainage adequate? Y Bench drainage was maintained throughout the quarter. <br /> See item 3. <br />9. Outslopes covered with 4' non-to>oc, N Slopes construced during the first quarter of 1994, on <br />non-combustble material? the northeast side of the pile, were not covered in <br /> anticipation of a pile design modification to increase the <br /> width of the pile in this area. <br />10. Berms constructed on outslopes? Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.