Laserfiche WebLink
(6) <br />of the bench, and the installation of select m2terial in the toe have been <br />• completed. These areas of the bench project have been done in proper work- <br />manship manner and according to the plan approved by Colorado Mined Land <br />Reclamation. <br />Areas of the project still requiring work are: stripping and clearing( <br />small amounts of stripping along the south end as fill progresses), completion <br />of the drainage structures on the #1 Pond, placement of. colluvium as cover <br />and at each end, installation of the underdrains, placement of coal waste, <br />and reclamation. The work done to-dahe in these areas has been done in a <br />proper workmanship manner and according to the approved plan. <br />Based upon the information stated iiercin, regular field investigation, and <br />C <br />professional consultation, I hereby certify that Blue Ribbon Coal Co.'s <br />Bench project has been done in accordance with the plan approved by <br />Colorado Mined Land Reclamation. <br />\__J <br />