My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP40575
DRMS
>
Back File Migration
>
Report
>
REP40575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:32:15 AM
Creation date
11/27/2007 8:46:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Report
Doc Date
12/18/1995
Doc Name
BEAR COAL CO 1992 1993 & 1994 AHR REVIEWS PERMIT C-81-033
From
J E STOVER & ASSCOCIATES
To
DMG
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NINE RNGINBERING <br />NINB RBCLAMATION <br />J. E. STOVER & ASSOCIATES <br />2768 C014PASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FA% 242-7908 <br />iii iiiiiiiuiiiiiii <br />CIVIL SNCIN66RING <br />CON6TRUCTION MANAGF74NT <br />~~ <br />y <br />December 14, 1995 <br />Anthony Waldron <br />Division of Minerals b Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 60203 <br />RGr.FIVED <br />OEC 18 1995 <br />Division o1 Pn~nerals & Geo~oyy <br />Re: Bear Coal Company <br />1992, 1993 b 1994 AHR Reviews <br />Permit C-81-033 <br />Dear Mr. Waldron: <br />The Division's letter dated December 1, 1995 transmitted additional <br />questions regarding Bear's 1992, 1993 and 1994 annual hydrologic reports. <br />Following are Bear's responses to the Division's concerns. <br />Monitoring Requirements and Frecuencv <br />1. Enclosed are new pages for the 1992, 1993 and 1994 AHR's which <br />indicate that a visual inspection for oil and grease was performed <br />on the alluvial well samples and none was noted. <br />2. No response required. <br />3. The upper french drain was installed April 12, 1993. The Division's <br />letter notes the french drain was installed four months prior to the <br />approval of the repair plan. This is true, however by its approval <br />of MR-012, the Division approved an interim repair plan which <br />provided for the installation of the upper french drain. Enclosed <br />is a revised page for the 1993 AHR which clarifies the date the <br />upper french drain was installed. <br />4. Bear will send a copy of the information which it submits to the <br />Department of Health regarding the correction of the 1993 second <br />quarter DMR. <br />5. A revised page is enclosed for the 1992 AHR which explains the <br />meaning of "NT" (not taken) and why depth to water was not taken for <br />AA1 during the fourth quarter monitoring event. <br />6. No response required. <br />ouality Analysis and Predictions <br />1. No response required <br />
The URL can be used to link to this page
Your browser does not support the video tag.