Laserfiche WebLink
<br />S I . <br />• ~ lambert at1D ~,~,~oeiates <br />• CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NU[•1BER M90Cll 6MT DATE February 2f3,1?~~fi' <br />PROJECT NAh1E West Elk Gob Pile <br />TECHNICIAN D. Dos toler <br />PROJECT LOCATION WEATHER CONDITIONS <br />West Elk Coal Mine Semi-r_loudv <br />wind/ <br />CLIEP1 TWest Elk Coal i9ine LJO R'f. RE~~U F.S TE^ <br />Density Tests <br />Cr?NT RACTO P. FOREMAN hls. ~ Kathy Welt <br />lPO RK PERFORMED BY LA FiBERT AND ASSOCIATES REPRESENTATIVE (ANC RE?^.A RKS) <br />• <br />• <br />I arrived at the project site at 2:OOPf4 as requested by Ms. Kathy <br />Welt. <br />I performed soil moisture content and soil density tests as requested <br />by Kathy Welt of material being placed on the gob pile using nuclear <br />soil density test methods. Please refer to the test results sheet <br />for approximate test locations and test results. The test locations <br />were determined by Ms. Kathy iaelt of West Elk. The test results <br />indicated only the relative compaction and soil moisture content <br />of the materials tested at the elevation and location tested at <br />the time of our site visit. <br /> <br /> <br />