Laserfiche WebLink
• Soil Redistribution <br />No final graded reclamation areas were available to be topsoiled during the 1996 field <br />eeaeon. All topsoil salvaged during this period was placed in stockpiles A, B, C, D, E, I <br />and Temporary. The stockpile Sites are shown On the Y96AEPL.DwG drawing file. <br />Revegetation <br />Revegetation activities in 1996 included the permanent revegeta tion of 9.37 acres around <br />the Eac ilities area and Pond L0. Permanently seeded acres are shown on drawing Eile <br />Y965EED.DWG. See Table 96.2 Eor Seed Mix used during 1996 revege to ti on activities. There <br />were no mulching operations or weed control on the Yoast Mine during 1996. <br />Monitoring <br />There were no revegeta ti on or soils monitorinq studies on the Yoast Mine during 1996. <br />wildlife Monitoring <br />eig Game Aerial studies were comple Ced by Powder River Eagle Studies, Gillette, WYO., <br />during January 1996. See Wildlife Tab, Yoast Hine Site 1996 Big Game Aerial Survey. <br /> <br /> <br />2 <br />