My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP39925
DRMS
>
Back File Migration
>
Report
>
REP39925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:28:06 AM
Creation date
11/27/2007 8:35:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
2/28/1992
Doc Name
1991 AHR TEXT
Annual Report Year
1991
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and floating solids is performed in accordance with the terms and frequencies stipulated <br />in NPDES Permit N0. CO-0000221. Flow at Sites NPDES 002 and 003 is monitored continuously <br />through the year via H-flumes with Stevens Type F water level recorders; flow at Sites <br />NPDES 004 and 008 is monitored continuously via Parshall flumes equipped with Stevens Type <br />F water level recorders. The only time of [he year during which floe is not monitored <br />continuously is during the winter months when the stilling wells are frozen. <br />Stream Monitoring Sires SW-52-1, 2, 5, and 6 are monitored monthly for instantaneous flow <br />and field parameters from March through October. Cres[ stage gages are Located at each of <br />the stream sites. All crest stage gages are used to record peak flow stage heights. Peak <br />flows are then calculated by incorporating these peak flow stage values and channel survey <br />data (stream cross section and slope) into the Monolog's Equation. Appendix F of this AHR <br />contains the most recent versions of rating curves developed for the crest stage gages. <br />All of the NPDES and stream monitoring Sites 1, 2, 5, and 6 are sampled three times a year <br />for water quality. The first sample of the year is collected prior to peak runoff <br />(March); the second sample is collected after peak runoff (May or June); and the third <br />sample is collected during base floe conditions (September). Samples collected at alt <br />these sites were analyzed using the surface water long list, Table 14 (Appendix A). <br />Four new surface water sites were added at Seneca II in 1987. Site SN-S2-10 is at the <br />mouth of Cow Camp Creek, Site SN-S2.11 is on Fish Lreek upstream of the confluence with <br />Cou Camp Creek, Site SW-52-12 is at the mouth of Bond Creek and Site SW-S2-13 is on Fish <br />Creek downstream of the confluence with Bond Creek. They were monitored monthly May <br />through September. However, as a result of Technical Revision 20 (approved October 2, <br />1990), when no floe is observed at the Lou Camp or Bond Creek sites (Sites 11 and 13 ), the <br />two Fish Creek sites (Sites 10 and 12) are not monitored. This year, monitoring occurred <br />at these four sites in May and June. <br />At the Seneca [I Mine, there are four springs (native) that are sampled annually (in May): <br />Springs #1, 2, 3, and 5. They are analyzed using the surface water long List, Per a <br />request by Cathy Begej of the CML RD during the spring of 1990, the nine spoil springs, <br />formerly monitored in September, were monitored in the spring season after the ground had <br />dried from snoumelt. Monitoring consisted of field parameter and flow measurements. In <br />addition, Spoils Spring #1 was monitored for the long list concurrently with Site SW-S2-6, <br />and was monitored biweekly and concurrently with NPDES 004 for flow and field parameters <br />from March to June. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.