Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2006 <br />Eaele Mine Complex C 81-044 BTU Empire Comoration <br />Mine Name Permit # Permittee <br />Address: 29515 RCR #27 Oak Creek. Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each yeaz, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as <br />required by the approved permit. The location of the acreage reported under each land status category and yeaz of seeding (if <br />applicable) should be clearly and accurately identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total I <br />Acres disturbed 422.0 0 422.0 <br />Acres backfilled and graded 262.0 0 262.0 <br />Acres topsoiled 262.0 0 262.0 <br />Seeding typically begins the minimum 10-yeaz reclamation liability period. Please report the acres for each category below. <br />Do not include acres that have achieved final. Phase III release. <br /> Last Years <br /> Cumulative This Calendar Cumulative 10 years or less Greater than <br /> Total ear Total t 10 ears I <br />Acres seeded* 262.0 0 262.0 3.2 258.8 <br />*Include, if necessazy, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 442.0 and the total number of acres: <br />Phase I released 20.0 Phase II released 20.0 Phase III released 20.0 <br />For Mines in Permanent Cessation <br />Total acreage in facilities subject to reclamation but yet to be completed: N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities: 160.0 <br />Acreage in active mining areas: N/A <br />~ (Exclude acres where Phase III release has been achieved) <br />~ Includes haul and access roads; temporary dams and impoundments; pemnanent dams and impoundments; diversion and collector ditches, water and air <br />monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and cons[mc[ion areas; office area, repair shops, and parking; coal stockpiles, <br />loading, and processing areas; railroads; coal conveyors; refuse piles and coal mine waste impoundments; headof-hollow fills; valley fills; ventilation <br />shafts and entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />