Laserfiche WebLink
0 <br />0 <br />Permittee Name: Albert Frei and Sons, Inc <br />Permit No: M-83-33 <br />Operation Name: Walstrum Mine <br />Anniversary Date: 06 / 23 / 92 <br />Page 2 <br />We will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.4.1 of the Rules and Regula- <br />tions. <br />2.4.1 <br />(1) No new land was disturbed this year mining continued in the <br />area previously stripped in Phase 1. Total disturbance to <br />date in Phase 1 is 17.61 acres ±. We mined all area stripped <br />except a small area within the transportation corridor on the <br />south side of Stage I, 1.93 acres ± (brown). The floor area <br />increased by 1.43 acres ± as the face of the mine moved into <br />the stripped area. The current face area is approximately <br />4.49 acres (yellow). Total disturbance is 25.34 acres ± <br />including Stage 1, and Phases A, w, X, Y, and Z. <br />(2) No reclamation was required this year. Tlie scale house and <br />scale was removed from Phase X in 1990 and initial grading <br />around the buildings is complete in Phase y (pink). Minor <br />amounts of backfill were placed in the valley on the eastern <br />side of Phase 1 as approved (blue) and continued in Phase Z as <br />approved (green). The table below outlines the various stages <br />of reclamation at the pit. <br />DESCRIPTION ACRES <br />Backfilled 2.63 <br />Graded 5.42 <br />Floor area 6.76 <br />Undisturbed 107.38 <br />(3) Mining will continue into the area previously disturbed. The <br />mine face will continue to move to the east towards the line <br />between Stages 1 and 2 as planned. Depending on the demand <br />for material, additional stripping maybe required in Stage 2 <br />(tan} as the face moves east. In addition, we may begin to <br />shape the top of the area between the road and the mine area, <br />above 7400 feet, this amounts to 1.35 ac. ± (orange). <br />Backfillinq will continue in Phases 1, and Z until they are <br />complete. <br />(4) If the material is available the backfilling in Phase Z will <br />be completed and the area will be graded and prepped for <br />revegetation next spring. Otherwise no other reclamation is <br />called for. <br />