Laserfiche WebLink
Bowie No. 1 Mine Subsidence <br />Survey date June, 2003 <br /> SUBSIDENCE MONITORING SURVEY TABULATION <br />• STATION 82 - GROSSE-RHODE RANCH SITE <br /> SURVEY DATE NORTHING FASTING ELEVATION -DOWN+UP <br /> Ute Engineering Surv ey Data <br /> 06-17-96 22647.00 3430.52 8651.33 - <br /> 11-10.97 22646.75 3430.60 8651.32 -0.01 <br /> Cragg Surveying Survey Data <br /> 07-10-98 22646.61 3431.05 8651.03 -0.29 <br /> 06-17-99 22646.51 3430.95 8650.72 -0.31 <br /> 06-24-00 22646.56 3430.99 8650.93 +0.21 <br /> 11-19-01 22646.22 3431.05 8651.68 +0.75 <br /> 08-23-02 22646.30 3431.13 8651.77 +0.09 <br /> Maximum 22647.00 3431.13 8651.77 +0.75 <br /> Minimum 22646.22 3430.52 8650.72 -0.31 <br /> Range 0.78 0.61 1.05 <br /> Cragg Surveying <br /> GPS Survey Data <br /> 11-19-01 22644.21 3432.53 5650.99 - <br /> 08-23-02 22644.27 3432.64 8650.97 -0.02 <br />• 06-19-03 22644.25 3432.66 8650.96 -0.01 <br /> Average Value 22644.24 3432.61 8650.97 <br />S1-21 <br />