Laserfiche WebLink
Bowie No. 1 Mine Subsidence <br />Survey date June, 2003 <br /> SUBSIDENCE MONITORING SURVEY TABULATION <br />• STATION 8 1 - GROSSE-RHODE RANCH SITE <br />SURVEY DATE NORTHING FASTING ELEVATION -DOWN+UP <br />Ute Engineering Survey Data <br />06-17-96 22372.39 5059.17 8353.41 - <br />11-10-97 22372.29 5059.09 8353.10 -0.31 <br />Cragg Surveying Survey Data <br />07-10-98 22372.19 5059.18 8353.50 +0.40 <br />06-17-99 22372.03 5059.13 8353.36 -0.14 <br />06-24-00 22372.01 5059.33 8353.15 -0.21 <br />11-19-01 22371.86 5059.15 8353.91 +0.76 <br />08-23-02 22371.94 5059.31 8354.01 +0.10 <br />Maximum 22372.39 5059.33 8354.01 +0.76 <br />Minimum 22371.86 5059.09 8353.10 -0.31 <br />Range 0.53 0.24 0.91 <br />Cragg Surveying <br />GPS Survey Data <br />11-19-01 22370.00 5060.65 8353.22 - <br />08-23-02 22370.06 5060.83 8353.21 - 0.01 <br />• <br />O6-19-03 22369.99 5060.80 8353.17 -0.04 <br />Average Value 22370.02 5060.76 8353.20 <br />S1-20 <br />