Laserfiche WebLink
Inspection Report <br />` ~ Page 2 <br />.- <br />6. The waste dump is being constructed using recognized pro- <br />fessional standards. <br />7! All vegetative and organic matter has been removed from the <br />disposal area, and the topsoil has been stripped and stock- <br />piled for future use. <br />8. Slope protection has been provided in the form of contour <br />discing and hydro-mulching to minimize surface erosion. <br />9. No underdrainage systems were required. <br />10. The waste dump fill appears to have been constructed, as <br />specified in the design as approved by the Divisionlof <br />Mined Land Reclamation. <br />The waste dump complies with the intent of the regulations. <br />Ron S. Hamagami <br />Professional Engineer <br />Colorado License No. 18024 <br />RSH:mp <br />