Laserfiche WebLink
Table 5 - No. 5 Mine Discharge Data - Instantaneous Measurements <br />Date Discharge (9Pm) <br />01-09-86 1,531.1 <br />01-16-86 1,665.8 <br />01-23-86 1,357.3 <br />01-30-86 1,357.3 <br />02-07-86 1,351.3 <br />02-14-86 628.7 <br />02-21-86 5.5 <br />02-27-86 1,162.7 <br />03-06-86 1,162.7 <br />03-14-86 1,487.0 <br />03-20-86 1,162.7 <br />03-26-86 1,665.8 <br />04-02-86 1,487.0 <br />04-10-86 1,357.3 <br />04-17-86 15.0 <br />04-24-86 988.0 <br />05-02-86 15.0 <br />05-08-86 34.9 <br />05-15-86 244.5 <br />OS-22-86 1,162.7 <br />05-30-86 538.9 <br />06-06-86 1,701.6 <br />06-12-86 1,357.3 <br />06-20-86 1,357.3 <br /> TOTAL Z~{ (24,802.9 10`~,~[5 <br /> 6~g <br /> '~~.s ~s <br />Since the 1985 study, room and pillar production has ceased; all <br />production mining is by longwall. The areas mined since the last report <br />are shown on the attached map. <br />1.5 Results of Study <br />The results of the study are presented in Table 6. This table provides <br />field parameters and flow measurement results from each of the sampling <br />points. <br />-6- <br />