Laserfiche WebLink
• Analysis of Subsidence Data <br />The following table presents an analysis of the subsidence survey data. Panel 61 had <br />advanced under the 24 and 26 Station numbers during the period. Following is a <br />summary of the survey data collected during the period. There was no activity near <br />Hubbard Creek or Dove Gulch. The survey data presents the subsidence over the west <br />D-Seam longwall panels after all three panels were complete and mining the B-1 Panel <br />was essentially complete. Subsidence monument 26E is located near the center of <br />panels WD1 and 61. WD1 resulted in subsidence of approximately 4.7' and 61 caused <br />and addition 5.8' of subsidence. <br />u <br />Station General Location Result <br />7A - 7C Hubbard Creek No significant change <br />17A -17F Hubbard Creek No significant change <br />1A-1J D4 Headgate and <br />North Mains Mining complete. Maximum subsidence 2.2' over D4 <br />head ate 1A <br />23A - 23C Mouth of Dove Gulch No sign cant change <br />24A - 24G Blest Submains & WD1 8 Mining complete. Maximum subsidence 4.9' (24E) <br />25A-25F WD2 Panel Mining complete. Maximum subsidence 6.2' (25C) <br />26A- 26G WD1 Panel & 61 Mining complete. Maximum subsidence 10.5' (26E) <br />27A - 27D WD2 Panel Mining complete. Maximum subsidence 4.2' (276) <br />28A - 28D WD1 Panel Mining complete. Maximum subsidence 6.9' (28B) <br />29A - 29D WD2 Panet Outcrop No significant change <br />30A - 30D WD Panels Outcrop No sign cant change <br />31A-31C D1 Tailgate No significant change <br />Further analysis of subsidence is presented in the enclosed paper titled Subsidence <br />Characteristics at Bowie Mines, Colorado, prepared by Hamid Maleki, Collin Stewart <br />and Greg Hunt. <br /> <br />