Rule 4.05.13(4)(c)(ii) Water quality data obtained from each monitoring site during the water
<br />year; and
<br />The report is in compliance with this rule, with the exception of a sample from the TCS-1 well,
<br />and that April monitoring results have not been reported since 1996 for some sites. See the table
<br />below. The data for this report is requested of the operator. A statement in the report indicates
<br />that the range of data was adequate to capture the peak runoff volumes in Trout Creek.
<br />Rule 4.05.13(4)(c)(iii) If required by the Division, a written interpretation of the data and
<br />identification of mining related impacts to the hydrologic balance.
<br />The Division has made no such requirement, but interpretations are presented. Trends in surface
<br />and ground water quality are discussed, and there is a summary statement that all values for TDS
<br />are consistent with the probable hydrologic consequences projections (page 9 of the report). See
<br />the discussion below under Probable Hydrologic Consequences.
<br />A summary of monitoring and reporting is as follows:
<br />Description of site and monitoring PAP, page AHR, page numbers
<br /> number
<br />
<br />surface water
<br />TR-a, flow, April -October, Trout Creek 4.6-139 1, 3, Appendix. A, Average
<br /> Streamflow, a e 2 of 2
<br />TR-b, flow, April -October, Trout Creek 4.6-139 1, 3, Appendix A, Average
<br /> Streamflow, a e 2 of 2
<br />TR-A, quality ,April -October, Trout 4.6-140 1, 4-25, Appendix A, Surface
<br />Creek above mine Water Monitoring Site TR-A,
<br /> a e3of3
<br />TR-B, quality ,April -October, Trout 4.6-140 1, 4-25, Appendix A, Surface
<br />Creek (East Ridge} Water Monitoring Site TR-B,
<br /> a e3of3
<br />TR-C, quality ,April -October, Trout 4.6-140 1, 4-25, Appendix A, Surface
<br />Creek (Moffat) Water Monitoring Site TR-C,
<br /> a e3of3
<br />TR-D, quality ,April -October, Trout 4.6-140 1, 4-25, Appendix A, Surface
<br />Creek (below mine) Water Monitorring Site TR-D,
<br /> a e3of3
<br />
<br />alluvial round water
<br />TR-1.5, level and quality ,Trout Creek 4.6-140 & 141 1, 26-45, Appendix $, Ground
<br /> Wafer Elevations, page 2 of 2;
<br /> Ground Water Monitoring Site
<br /> TR-1.5, a e 3 of 3
<br />TR-3, level and quality , Tmut Creek 4.6-140 & 141 1, 26-45, Appendix B, Ground
<br /> Water Elevations, a e 2 of 2;
<br />Page 4
<br />
|