Laserfiche WebLink
<br />111 lIIIIIIlI!!II Ill <br />ROADSIDE REFUSE DISPOSAL AREAS <br />Permit Documentation Applicable to 8/97 Special Focus Inspection <br />Cameo Refuse Disposal Area 1 (CRDA-1) <br />Cameo Refuse Disposal Area 2 (CRDA-2) <br />Roadside Refuse Disposal Area (RSRDA) <br />Permit Application Document (3/1/96) <br />Vol. 2 <br />Tab 6 Geology <br />Fiq. 6-2, Chemical and Physical Analyses of Roof and Floor and <br />Processing Waste Material. <br />Appen. 6-2, Additional Coal Waste Analyses <br />Vo. 3 <br />Tab 13 Operation Plan - Permit Area <br />Page 13-3, Temporary refuse roads narrative. <br />Page 13-5, Ditch design narrative. "Collection and Diversion <br />Ditches associated with the refuse piles are designed for 100 <br />year, 24 hour precip events..." Also permanent stream channel <br />diversions. <br />Page 13-10, CRDA No. 1 drainage narrative. 100 year <br />collection ditches drain to Pond 6. SAE areas at reclaimed <br />topsoil stockpile sites. Reference Exhibit 9B, Appen. 13-2, <br />Table 13-5. <br />Page 13-12, RSRDA drainage narrative. Northwest slope ditched <br />to Pond 8; upland diversion ditch/ various collection ditches, <br />grated drains and culverts to direct flow from refuse slopes <br />and draw between upland diversion and refuse area into Pond 9. <br />Reference Exhibits 6A and 6B, Fig. 13-1, Appen. 13-2. <br />Page 13-13, CRDA 2 drainage narrative. Upland permanent <br />diversion. Perimeter collection ditches direct flows to Pond <br />10. Reference Exhibit 51, Table 13-4, and Appen. 13-2. <br />Page 13-17. CRDA 1 topsoil salvage narrative. Reference <br />Exhibit 9B. <br />Page 13-18, CRDA 2 topsoil salvage narrative. Reference <br />Exhibits 51 and 52. <br />Page 13-20 through 13-23. Section 2.05.3(8) waste pile <br />construction narrative. RSRDA stability analysis Appen. 13-4 <br />referenced. CRDA 1 reference Exhibits 9A, 9B, 18 and 20. <br />CRDA 2 reference Exhibits. 9C, 51, 52, 53, Appen 13-2. <br />