Laserfiche WebLink
Permittee Name: •~itewater <br />•Permit No: M-77-129 <br />Operation Name: Whitewater <br />Anniversary Date: 09 / 22 / <br />Building Mate, Corp. <br />500 Pit <br />91 <br />Reference is made to MLRB Rules and Regulations, Section <br />2.4.1. <br />(1) Mining continued in Stage 1 and Stage C on the areas pre- <br />viously stripped. We continued to mine in Stage 1 removing <br />an additional 6.34 acres ± and we mined 0.81 ac. ± in Stage <br />C (brown). All of the area mined was disturbed previously. <br />The plant site in Stages W, Z and 2 is still in use (tan). <br />(2) We have resumed backfilling in Stage Y as approved (yellow). <br />No other stages require reclamation at this time. No <br />planting was scheduled for this year. A small section of <br />bank sloping was shaped on the south side of Stage 1 (green). <br />We have been forced to reshape a section of the river bank <br />along the north side of Stage Y that the river continues to <br />wear it away (gray). Over the years it has taken the large <br />overburden pile we had piled there for backfilling Stage Y. <br />Most of the materials mined this year were confined to the <br />portion of Stage 1 that will be lake bottom when reclamation <br />is complete. The slopes in Stages B s part of C have been <br />shaped (green). We may Bydro-Mulch them this fall if <br />weather permits. <br />(3) We will mine approximately 5.14 acres in Stage 1 and complete <br />the 1.88 acres ± remaining in Stage C this next year (dark <br />blue) . Both of these areas were stripped previously. If, <br />Stage C is completed this year mining will commence in Stage <br />D. Stage Z is still in use as approved in the plan. <br />(4) Monitoring has continued in the areas where revegetation has <br />been done in Stage X. Natural invasion of surrounding veget- <br />ation is starting to happen. The amendment was submitted in <br />1981 explained that until we stop dewatering Stage 1 the <br />chances of establishing vegetation in Stages X, Y and the <br />banks of Stage 1, are very slim because of the very arid <br />conditions in this area. Until water re-fills the lake, we <br />will not be revegetating Stages X, Y and 1. We will continue <br />backfilling the area in Stage Y as approved. The material <br />will come from Stage 1 and D when stripping begins. We will <br />continue to establish slopes within the mined areas as mining <br />progresses as they are called for in the reclamation plan. <br />