My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP38715
DRMS
>
Back File Migration
>
Report
>
REP38715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:22:00 AM
Creation date
11/27/2007 8:10:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
2/4/1981
Doc Name
GEOTECHNICAL AND DESIGN STUDIES MOUNT GUNNISON COAL MINE SOMERSET COLO FOR MERRICK AND CO
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 2 - <br /> <br /> <br />1 <br /> <br />1 <br /> <br /> <br />t <br /> <br /> <br />During the third and last phase of the study, more detailed <br />work has been performed to assess the feasibility of the con- <br />struction of individual structures or facilities that are lo- <br />cated within the landslide area and to provide the designer <br />with appropriate design recommendations for them. Numerous <br />meetings have been held with the representatives of Merrick <br />and Company and ARCO Coal Company during the course of our <br />work and individual problems have been discussed. The results <br />of this phase of the studies are presented in this report. <br />1.2 SCOPE OF THE STUDIES <br />The scope of the Phase 3 of our study was to evaluate the <br />interaction of the landslide deposits and the structures or <br />facilities located within the landslide area as it was de- <br />lineated during the Phases 1 and 2; the proposed .mine entries <br />and mine bench were of particular interest. The proposed access <br />road and other structures or facilities have been included in <br />our studies although less detailed field and office work have <br />been performed in relation to them. <br />1.3 METHOD OF THE STUDIES <br />Our previous report (see reference in part 1.1) concluded <br />field and office work related to the delineation and character- <br />ization of the landslide; results of this part of the study <br />will not be repeated within this report. <br />To accomplish the scope of Phase 3, the following work has <br />been performed: <br />1. Drilling of a total of six borings E-1, E-2, E-3 (these <br />three holes were assigned symbols P-1, P-2, and P-3 in our <br />aiwrco~o cowuna, e¢ <br />
The URL can be used to link to this page
Your browser does not support the video tag.