Laserfiche WebLink
1 <br /> <br /> <br />IX. VEHICLE HAIIL ROADS <br />CONTROL OPTIONS !OR VEHICLB BAIIL ROADS <br />1 <br /> <br />1 <br /> <br />t <br />1 <br /> <br /> <br />1 <br /> <br />1 <br />1 <br /> <br />1 <br />1 <br />t <br />(DO NOT *RITE IN THIS SECTION) <br />1. Watering (specify) times/day, to maintain moist surface. <br />2. Chemical stabilization <br />(according to manufacturers specifications) <br />Specify: <br />a. Frequency of application and <br />b. Type of stabilizer (brand name, or composition) <br />3. Paving to be completed by <br />4. Gravel <br />(date). <br />(LIST HAUL ROAD CONTROLS IN THE APPROPRIATE SPACES BELO11) <br />A. TRANSPORT OF RAIi MATERIAL FRO?! RE!lOVAL BITE TO PrnrPSSin~+~lnit <br />Distance (oae vap) maximum 2,500 feet <br />If stockpile is off site, give distance from removal site to mine <br />entrance <br />Haul vehicle capacity 4-6 C.Y No. of wheels 4 <br />Average vehicle speed ~ m.p.h. <br />Maximum vehicle speed -~~ m.p.h. (cannot exceed 30 m.p.h) <br />No. of trips per day i50 avg. <br />Haul road silt content (if Ynovn) t. <br />List controls for raw materials transport: (sea teasures listed above) <br />Proposed controls no control for raw material, haul route will be watered as <br />nee e~intain a moist surface. <br />8 <br />