Laserfiche WebLink
L~ <br /> <br />VIII. FINISHED PRODUCT <br />A. LOADING INTO FINISHED PRODUCT STOCKPILE <br />Method of loading in (front-end loader, conveyor, etc.) <br />Conveyor <br />' If conveyor is used, what is maximum drop height? 10 ft. <br />Loading schedule: 115 tons/hour 8 hours/day 275 days/year <br />Proposed controls moist materials <br />t Controls for loading to stockpile include other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppressants, <br />reduced drop height, telescoping chute <br />' 8. FINISHED PRODIICT STOCKPILE - Road base and/or asphalt materials <br />Maximum tons stored at one time 100 000 tons. <br />Length of time pile remains undisturbed less t an 24 hours , <br />Proposed controls: (cLeck appropriate bones) <br />' ^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />' ^ Chemical stabilizer (applied acco=ding to manufacturer's <br />specifications). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check one) <br />^ Revegetation, (length of time till revegetation ) <br />Other' (specify) moist material <br />^ No control <br />C. LOADING OIIT FROIi BTOCICPILE FOR FINAL TRANSPORT <br />Method of loading out (front-end loader, conveyor, etc.) <br />front-end loader <br />' If conveyor is used, what is maximum drop height? ft. <br />Loading schedule: 115 tons/hour 8 hours/day 275 days/year <br />Proposed controls moist material <br />' Controls for loading out of stockpile include Water injection, <br />chemical dust suppressants, bag collectors, other (specify), no control <br />water sprays, total enclosure, partial enclosure, chemical suppresants, <br />reduced drop height, telescoping chute. <br /> <br /> <br />