Laserfiche WebLink
<br />LJ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Excavated Material is <br />D. LOADING OIIT FROM RAA MATERIAL STOCKPILE: N/A loaded directly into the <br />Method of loading out (front-end loader, conveyor, etcP;°cessing equipment <br />Loading schedule: tons/hour hours/day days/year <br />Proposed controls for loading to stockpile: <br />Controls include: no control, water sprays, total exposure, partial <br />exposure, moist material, other (specify) <br />VI. PROCE68ING <br />Will processing (i.e., crushing, screening, etc.) occur on site? <br />Yes ^ No (check oae) <br />NOTE: ALL PROCESS EQIIIPMENT REQIIIRES A SEPARATE PERMIT APPLICATION AND <br />APEN (BEPARATE FORM IS ATTACHED AT END OF TH8 FORM - MAKE ADDITIONAL <br />COPIEB AB HEEDED). <br />Material loaded into processing equipment by: <br />Conveyor Front end loader ~`Y Other <br />CONTROLB FOR PROCESSING INCLIIDE: Moist or wet materials (specify <br />moisture k if kaom), water spray bars, bag filters, other <br />(specify), no control. If existing processing equipment will be <br />relocated from another location complete the following sections. <br />This equipment aunt already be permitted. <br />(LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACEB BELOW) <br /> <br />Lam' <br /> <br /> <br />1 <br /> <br /> <br /> <br />A. PRIMARY CRIISHING SOa <br />Maximum tons crushed per year 125,000 tons. <br />Maximum tons crushed per hour tons. <br />Hours of crushing per day hours. <br />Proposed controls (see above) water spra~~ ars/ uuoist material <br />B. SCREENING/CLASSIFYING 100$ <br />Maximum tons screened per year 250,000 tons. <br />Maximum tons screened per hour tons. <br />Hours of screening per day hours. <br />Proposed controls (eee above) wa er spra~~ ars/moist material <br />C. SECONDARY CRIISHING N/A <br />Maximum tons crushed per year <br />Maximum tons crushed per hour <br />Hours of crushing per day _ <br />Proposed controls (ee• above) <br />tons. <br />_ tons. <br />hours. <br />5 <br />