My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-06-26_REPORT - M1995035
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1995035
>
1995-06-26_REPORT - M1995035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 5:06:01 PM
Creation date
11/27/2007 8:09:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995035
IBM Index Class Name
Report
Doc Date
6/26/1995
Doc Name
CONNELL RESOURCES INC WELLINGTON DOWNS PIT APPLICATION TO LARIMER CNTY FOR USE BY SPECIAL REVIEW
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />i~ <br />v. <br />1 <br />RAW MATERIAL <br />11. REMOVAL <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Tons removed per year DSO 000 <br />Maximum tons removed per day 900 <br />Equipment used for removal ronten <br />Equipment capacity (in tons) $ - ~ <br />Est. hours per year required for removal <br />Is material dry, moist, or vet? moist <br />Specify moisture content if known ($) <br />B. LOADING IN TO RAIL MATERIAL STOCKPILE <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />front-end loader <br />Loading schedule: 11' tons/hour ° hours/day ~" days/year <br />Proposed controls for loading to stockpile: m~,y~ m~~,-; ay <br />Controls include: no control, water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAI- !MTERIAL BTOCICPILE NSA Excavated material is loaded directly into <br />the processing equipment. <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time <br />Length of time pile remains undisturbed <br />Proposed controls for raw aatsrial stockpile: (cLeck appropriate boaes) <br /> <br />a <br />O <br />watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (Type: ). <br />Compacting of piles, method <br />Enclosures: complete, or partial (cLeck one) <br />Other (specify) <br />No control <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.