Laserfiche WebLink
<br />i~ <br />v. <br />1 <br />RAW MATERIAL <br />11. REMOVAL <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Tons removed per year DSO 000 <br />Maximum tons removed per day 900 <br />Equipment used for removal ronten <br />Equipment capacity (in tons) $ - ~ <br />Est. hours per year required for removal <br />Is material dry, moist, or vet? moist <br />Specify moisture content if known ($) <br />B. LOADING IN TO RAIL MATERIAL STOCKPILE <br />Method of loading in (truck bottom dump, front-end loader, etc.) <br />front-end loader <br />Loading schedule: 11' tons/hour ° hours/day ~" days/year <br />Proposed controls for loading to stockpile: m~,y~ m~~,-; ay <br />Controls include: no control, water sprays, total enclosure, partial <br />enclosure, chemical suppressants, reduced drop height, telescoping <br />chute, other (specify) <br />C. RAI- !MTERIAL BTOCICPILE NSA Excavated material is loaded directly into <br />the processing equipment. <br /> <br />MATERIAL <br />ROCK <br />COAL OTHER <br />Maximum tons stored at any one time <br />Length of time pile remains undisturbed <br />Proposed controls for raw aatsrial stockpile: (cLeck appropriate boaes) <br /> <br />a <br />O <br />watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />Chemical stabilizer (Type: ). <br />Compacting of piles, method <br />Enclosures: complete, or partial (cLeck one) <br />Other (specify) <br />No control <br />4 <br />