Laserfiche WebLink
OCT-M-2000 15739 W LSH EW:RONII.NTAL 3034430367 P.Ob <br /> Caribou Perk Renoradon Prvpwal <br /> Pale S <br /> locations of potted shrub, potted herb.xeous and seed planting areas/masses throuc,hout <br /> the restoration area (i.e., wetland and transitional habitat). The planting plan will i.e <br /> formulated with the goal of restoring :he transitional and wetland plant communities to <br /> documented, pre-disturbance conditions. (Note:: Although an initial seeding is proposed <br /> in Task 2, sub-task 1, seed availability Is severely limited. Therefore,sufficient <br /> quantities and varieties of seed stock arB not available to implement the entire seeding <br /> plan in October 2000. The seeding proposed in this task will supplement and complete <br /> the seeding plan initiated in October 1.000). <br /> Task 3: Implementation of Immediate Response]Habitat Restoration <br /> WALSH has prepared a detailed cost ?loposal I'or the immediate response restoration <br /> (cost included herein). The immediate -esponsrs habitat restoration is planned for October <br /> 2000,prior to permanent ground free2inglsnow cover. <br /> Phase 2: Final Restoration Implementation,Maintenance and Monitoring <br /> Task 1:Backfilling,Grading,;md Planting Implementation <br /> Following the Namral Resource Dama.ge Assesrmeat and Restoration Design <br /> accomplished in Phase 1,WALSH proposes to implement the Final Backfilling. Grading <br /> and Planting Plans (Phase 1,Task 2,sib-tasks 2 and 3)in the Spring of 2001.Daring this <br /> task, deeply rutted and disturbed trans:.tional areas (outside of the wetland area)will be <br /> backfilled with imported soil and graded to their original condition. Compacted e:oi_s will <br /> be tilled or aerated in preparation for seeding and planting. Once backfrlling and gntding <br /> are accomplished,impacted wetland and transitional areas (i.e., road and upland impacts) <br /> will be planted with nursery grown herbaceous:Ind woody captainer stock.During this <br /> task additional wedand seeding will be: done in order to include species that may not have <br /> been available prior to the Fall 2000 seeding. <br /> Preliminary cost estimates for completing Phase 2, Task 1 assume i acres of herbaceous <br /> planting in the wetland areas,2 acres cif herbaceous planting in transitional areas, and 2 <br /> acres of willow/shrub planting in wetland areas. <br /> Task 2: Phase 2 Cost Estimate <br /> A detailed cost estimate for the Spring of 2001 reswration activities will be developed <br /> once backfilling, grading and planting plans are complete. <br />