Laserfiche WebLink
OCT—M-2000 15:36 WRLSH EW 1 RONME.NTRL 3W443036" P.02 <br /> Environmental Sdentisu and Engncem l I C <br /> A Suteidiary of Eeoiog and Environment.Inc. <br /> October 13 2000 <br /> Thomas Hendricks <br /> Calais Resources Colorado, Inc <br /> P.O. Box 653 —Caribou <br /> Nederland, Colorado 80466-0653 <br /> Re: Scope of Work for Caribou Park Werland Restoration <br /> Dear.Mr. Hendricks: <br /> Walsh Environmental Scientists and En;oneers, L C (WAL';H)is pleased to assist Calais <br /> Resources with the assessment and restoration of the Caribou Perk wetland. As we have <br /> stated previously. we propose to approach this project In two phases. The first phas:is <br /> the assessment of the natural resource damage caused by the"Mudfest". Once collected <br /> and analyzed,the data will be utilized i:o prepare the restoration design plan. The second <br /> phase is the implementation of the restoration dt:sign. <br /> The following Scope of Work for Phase 1 outlines the steps necessary to document the <br /> site conditions,assess the damage result ng from the"Mucifest",and design the <br /> restoration of the Caribou Park wetland. Phase .t also includ.-s the implementation of the <br /> "immediate response" restoration measures, which Itre proposed prior to perrnanant <br /> freezing and snow-pack at Caribou Park(i.e., be Fort:the end of October 2000). Because <br /> of the sensitive nature of this project,it is imperative that WM SH document each step of <br /> the process and provide Calais Resourc es the most accurate data possible. These clat.i will <br /> be utilized to formulate a scientifically feasible and legally sound design approach tF at <br /> ensures the ultimate restoration of pre-disturbance habitat conditions. <br /> Although Phase i has not been implemented yet, and therefore;the resulting data are not <br /> available,we have included our best prol'essional estimate for the Phase 2 costs. Phase 2 <br /> will be implemented in spring 2001 (i.e.,after snow melt) anti will include final <br /> restoration implementation, maintenance and monitoring. <br /> The following tasks describe the approach WAUH proposes to utilize. <br /> 488E Pearl Em%E Circic . Suite 108 . Boulder.Colorad, . 803UI.2475 . Phone(303)443-3292 . FAX(303)4734367 <br />