Laserfiche WebLink
• Bowie Resources Limited April 30, 2004 <br />Bowie No. 2 Mine <br />2003 Annual Hydrology Report <br />These wells were installed as a requirement of PR-03 which allows the mine operator to relocate <br />Sediment Pond B to the south side of the highway. Alluvial Wells 11 through 13 were installed <br />during the fall of 2000 to motor the alluvium in an azea where a new coal loadout (PR-06) will be <br />constructed. Alluvial well 13 was eliminated by the construction of the unit train loadout. <br />Alluvial well 14 was installed during 2003 west of Pond K. Alluvial wells 15 through 17 were <br />installed during the fourth quarter of 2003 and aze located north of State Highway 133B below <br />the proposed coal mine waste disposal azea. <br />The 2003 sampling season provides results consistent with baseline information provided in the <br />permit application, showing no adverse impact to groundwater during the construction of the <br />mine. <br />Surface Water Monitoring Stations: PONDS <br />Stock Ponds P-1 through P-6 and P32-3, P33-3, P33-7, P33-10 and P33-11 aze monitored <br />quarterly for 1.) Inflow; 2.) Outflow; and 3.) Water level below spillway outlet or depth of water <br />in the pond measured from the bottom of the pond. Field data collected during the 2003 sampling <br />season is consistent with baseline information provided in the permit application. Photographs of <br />each pond except P-1 are provided. <br />• Surface Water Monitoring Stations: SPRINGS <br />Fifty five springs within the permit boundary were monitored during the 2003 monitoring season <br />in accordance with the Hydrologic Monitoring Plan. This plan indicates that identified springs <br />will be inspected quarterly for field parameters with full suite laboratory pazameters required on <br />springs with flows greater than five (5) gallons per minute. During the construction phase of the <br />mine, four (4) springs (S-6, S-7, S-9 and S-15) were eliminated by road and portal bench <br />construction activities. The 2003 field and laboratory analysis is consistent with baseline data <br />provided in the permit application. <br />• <br />