Laserfiche WebLink
<br />• Wellfield <br />Using the new horizontal drilling technology, one to three vertical wells will be drilled <br />between cavities 1A and 3A to connect the two cavities. One well will be located along the <br />south boundary of the present mining area, the second well will be located to the immediate <br />north of core hole well 26-3C, and well 26-3C will be recompleted as a production well. No <br />wells will be plugged and abandoned in 2001. Replacement or service of submersible <br />pumps will be performed as needed. <br />4.0 2000 PROJECT ACTNITIES <br />• 4.1 On-Site Facilities and Process Description <br />4.1.1 General Artangement <br />Figure 2-1 illustrates location of project leases, mining panel #1, monitoring wells, access <br />road and associated utility lines. <br />r <br />\` ~ <br />I <br />4.1.2 Plant Modifications <br />Major plant modification in 2000 included upgrading the plant air drying system and <br />installing a new barren heat exchanger. At present White River Nahcolite is in the process <br />of upgrading the isolation valves on the crystallizer tanks. <br />• <br />9 <br />