My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-04-10_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2000-04-10_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2021 8:05:04 PM
Creation date
11/27/2007 7:54:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
4/10/2000
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� s <br /> collected in 1999. All of the Aspen and 5,000 of the Bristlecone seeds were planted at a contract <br /> greenhouse and are planned for fall 2000 and spring 2001 site planting. <br /> The 1998-1999 Forest Queen reclamation developed nicely during the 1999 growing season. In <br /> November 1999, CC&V received the Abandoned Mined Land Reclamation award for this five- <br /> acre area. <br /> Per the requirements of C.R.S. 34-32-116(3), and C.R.S. 34-32.5-116(3)(a): <br /> Reclamation accomplished to date: 104.6 acres <br /> Reclamation accomplished during the preceding year. 23.1 acres <br /> New disturbances anticipated during the upcoming year: Continued construction of phase III <br /> of the Valley Leach Facility; Continued development of the Main Cresson Mine Area, East <br /> Cresson Mine Areas, and associated haulroads, sediment control measures,topsoil <br /> stockpiles, and other ancillary disturbances required to support these activities. <br /> Reclamation anticipated during the upcoming year: 10-20 acres of topsoil replacement, <br /> grading, seeding, and mulching as appropriate; approximately 10 new acres of topsoil <br /> stockpile to be constructed. <br /> Fin Warranty: <br /> Per 2CCR 407-1, 407-4, and Rules 1.15(1)(a), Surety Bond number JZ7711 (in the amount of <br /> $23,073,200)has been accepted by the Division, and continues to demonstrate the sufficiency of <br /> the value of the Financial Warranty. <br /> Per 2CCR 407-1, 407-4, and Rules 4.7(3), the insurance company's most recently available <br /> balance sheet is attached, demonstrating that the Surety Bond does not exceed ten percent(10%) <br /> of the bank's capital surplus accounts. <br /> Designated Mining Operation: <br /> Per 2CCR 407-1, 407-4, and Rules 1.15(I)(c), monitoring information required as part of the <br /> approved permit application and Environmental Protection Plan is routinely submitted to the <br /> Division. <br /> Please do not hesitate to contact me at 719-689-4056 if you have any questions. <br /> Sincerely', <br /> Phil Barnes <br /> Chief Environmental Coordinator <br /> cc: Teller County Planning Department, Attn: Ms. Jane Marmon, County Planner <br />
The URL can be used to link to this page
Your browser does not support the video tag.