Laserfiche WebLink
2.1.2 Project Scope <br />Project scope was for the construction of all surface production <br />and support facilities. Specifically included are: <br />Process Operations <br />1. Liquor storage and handling <br />2. CoolingJCrystallization <br />3. Dewatering, Drying, Granulation <br />4. Storage, Loadout <br />5. Evaporation Pond <br />6. Wash Water System <br />7. Domestic Sewage System <br />Ut <br />i 1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />ilities <br />Electrical supply line and distribution <br />Raw water well, pipeline and storage <br />Process water treatment and distribution <br />Plant and instrument air systems <br />Hot water heating and distribution <br />Cooling water system <br />Natural gas supply line and distribution <br />Low pressure steam generation <br />Telephone line <br />Building - Providing For <br />1. Process <br />2. Services (maintenance, utilities, lab, etc.) <br />3. Administration <br />4 <br />