Laserfiche WebLink
• the existing monitoring system and one well to act as a water <br /> supply source for the plant during construction and operation. <br />A total of five wells were drilled in 1990. The listing below <br />gives each well name and number and its purpose. <br />Name and Number Purpose <br />NaTec 26-90-1 Water Supply Well <br />NaTec 26-90-2 Dissolution Aquifer Monitor Well <br />NaTec 26-90-3 B-Groove Aquifer Monitor Well <br />NaTec 26-90-4 A-Groove Aquifer Monitor Well <br />NaTec 26-90-5 Horizontal Injection Well <br />In addition to the monitor wells drilled on the south end of the <br />• lease, several wells located on the north side were recompleted as <br />monitoring wells. Those wells are listed below: <br />Name and Number Purpose <br />IRI MMC 4 A-Groove Aquifer Monitor Well <br />IRI MMC 6 B-Groove Aquifer Monitor Well <br />IRI MMC 7 Dissolution Aquifer Monitor Well <br />IRI MMC 8 Perched Aquifer Monitor Well <br />2.5 Hvdrology Monitoring <br />2.5.1 Introduction <br />The monitoring plan is designed to determine impacts of NaTec's <br />mining operation (see Table 2-3 for history of the plan). Based <br />on results of initial 1991 mining and monitoring, future <br />28 <br />