Laserfiche WebLink
Mulching <br />• <br />All areas seeded were mulched with 2,000 lbsjacre hydromulch <br />following seeding. <br />Monitorina <br />Seeded areas will be visually inspected in 1991 followed by a more <br />comprehensive evaluation in 1992 and following years until results <br />indicated successful reclamation. Vegetation production, crown <br />cover and plant composition will be the basis for annual <br />comprehensive evaluation. <br />Fencing <br />• The process area soil stockpile, Na26-EX-2 pad and Na26-IRI-1 pad <br />have been fenced with four Strand barbed wire to exclude <br />livestock. <br />2.4 Review of 1990 Drilling and Workovers <br />During 1990, NaTec made a major commitment in establishing itself <br />as a producer of sodium bicarbonate in the Piceance Basin. <br />On September 17, 1990 the spudding of NaTec's first horizontal <br />injection well took place. Injection and product recovery are <br />expected to coincide with plant startup. In addition to the <br />horizontal well, several other wells were drilled to compliment <br />n <br />\J <br />27 <br />