Laserfiche WebLink
Logan Wash Mine Annual Report <br />Permit No.: M-1977-424 <br />GSHI will notify DMG as soon as possible regarding its intent to begin site reclamation and <br />removal from Temporary Cessation status. GSHI will submit an updated reclamation plan to <br />DMG and the BLM. Some reclamation activities may be dependent on the needs of the BLM; for <br />example, the BLM may want to retain the evaporation pond and some access roads. <br />8.0 Anticipated Disturbance in the Year 2003 <br />No new disturbance of significant acreage is anticipated in the year 2003. However, some <br />peripheral acreage may be disturbed during reclamation work; this acreage will be reclaimed <br />during final reclamation/revegetation work. It is possible that GSHI will commence with the <br />design and installation of a full-scale passive water treatment system at Logan Wash Mine. Such <br />work will require the submittal of a Technical Revision. At this time, construction of a passive <br />water treatment system is likely to occur on previously disturbed land (e.g. the main lower mine <br />bench). <br />Western Water Sa Land, Inc. 5 of 5 <br />DMGLWannlOS.doc <br />3!6/2003 <br />