My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36799
DRMS
>
Back File Migration
>
Report
>
REP36799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:00 AM
Creation date
11/27/2007 7:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
1/28/1993
Doc Name
1992 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 33, (alp; <br />• Sec. 34, lots 3 to 6, inclusive. <br />The area described contains 2379.60 acres, more or less. <br />Lease C-37474 <br />T.1S.. R.98W.. 6th P.M. <br />Sec. 16, NE1/4 NE1/4, W1/2 NE1/4, W1/2, and NW1/4 SE1/4; <br />Sec. 17, (all); <br />Sec. 20, NE1/4 NE1/4; <br />Sec. 21, NW1/4 NW1/4. <br />The area described contains 1200 acres. <br />The total area contained within the four sodium leases or mining unit is 8,222.6 <br />acres. <br />The location of the principle operation is: T.1 S., R.98W., Section 26. The access <br />road crosses portions of Sections 25, 26, 35 and 36 of T.1S., R.98W and Section <br />31, T.1S., R.97W. and Section 6, T.2S., R97W. Figure 2-1 shows the four <br />sodium lease tracts, plant site, access routes for right-of-ways for electrical power, <br />natural gas and monitoring road to the plant site, and water and production wells. <br />2.3 Leasehold Status <br />The sodium leases were issued July 1, 1971. Following exploration drilling and <br />bulk sampling by solution mining, permit applications to allow construction and <br />operation of a 3ton-per-hour (TPH) pilot solution mining facility were submitted on <br />October 4, 1983 and approved February 9, 1984. On May 2, 1986, an EA fora 6 <br />TPH pilot-scale operation was approved by the BLM. On November 20, 1987 the <br />. BLM approved the project plan for acommercial-scale (125,000 TPY) nahcolite <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.